Thursday 30 January 2014

Building a kiln

Building a kiln for Catherine



     Over the last few months / weeks I have been researching and designing a gas fired kiln for Catherine.


     She had in her garden a 1000 Lt water cube, the metal cage is ideal for the outside of the kiln.  I started by cutting one side off and that will now form the roof, !!!  I have formed the door and door frame out of angle iron that we recycled from an old disused european style potters kickwheel which would have gone as scrap.

       Catherine wants a front loading kiln that she can load and unload without bending, so we have raised it onto blocks, we will be lining the kiln with ceramic fiber and the chimney will be high tempurture kiln bricks. Lots more work to do ! 


     
This is how the cage was to start with.



The side cut off which now forms the roof.




  kiln sitting on top of blocks





kiln sitting on top of blocks waiting for next Phase !

Tuesday 14 January 2014

Studio [somewhat] finished

Happy new year all , It's been a while since my last post as I have been having loads of trouble uploading photos to blogger ! So I am having a go on my mobile ! Here goes -:

I have been busy in the studio not on the wheel unfortunately , no I have been tiling the floor all finished and is now a much cleaner environment to work in.
Also acquired a new table thanks to dear Doris thanks again.

 Yesterday was the first time on the wheel since well before Xmas !!! Anyhow I attempted my first teapot and threw a few bud vases also





Anyhow I hope to blog more often if this works !!!
Till the next time